Absolute dependability and security
Energy supply centre II AMD Dresden, Germany, 2005
The new EVCII uses a thermal power station to supply the AMD Fab 36 (install link here to the reference Fab 36) with electricity, hot and cold water in conformity with the high standards for semiconductor manufacture. The capacity of the EVC2 would be sufficient to supply a town with a population of around 150,000 with all its energy. However, the requirements for precision and quality leave no room for maneuver and are not comparable.
Client: Advanced Micro Devices, Inc. (AMD)
Service scope: General Contractor for consultation, planning and construction
Key data:
- Order volume 66 million euros
- 12 MW electricity, 29 MW hot water, 20 MW cold water at absolute top quality
- Efficiency up to 85%
Construction time: 13 months
Special features:
- Designed also in the millisecond range for uninterruptible power supply to sensitive chip production systems
- Energy and cost optimization
|
|
|